Corpus Christi Mobile Home Leveling
v1 · Reviewed July 27, 2026
Mobile Home Leveling Call and Site-Visit Checklist
Safety
Please read this before you look: do not crawl under a manufactured home, remove supports, or attempt to jack, block, shim, or anchor it. The area can involve crush, electrical, gas, plumbing, and confined-space hazards. Observe only from a safe exterior position.
Work through the checklist below before a call or a site visit. Every item is something you can note from a safe position outside the home. Check off what applies and write down the details next to it. Field definitions and the sources this checklist is built from follow at the end.
About the home
What changed
About the property
Safe photos only
License questions to ask
Scope questions
Paperwork to request after the work
Comparing two written proposals
Change-order questions
How to use this checklist
The goal is a clear, organized description of the home and what you are seeing, so a conversation about scope and terms can happen without guesswork. Note the home type and approximate dimensions, record the symptoms and when they started, take exterior photos only, and ask for a license number and written scope before any work is agreed to. Keep the paperwork items for after the work is done.
Field definitions
- HUD certification label
- A metal label affixed to the outside rear of each transportable section of a manufactured home built to the federal standard. Its number identifies the section. Read it only if it is safely visible from the ground; do not climb or reach into an unsafe position for it.
- Data plate
- A paper or printed information sheet inside the home, commonly on or near the main electrical panel or inside a kitchen cabinet or bedroom closet. It records the home’s design and manufacturing details.
- Support versus stabilizing components
- Support components (piers, caps, shims, footings) carry the home’s weight. Anchors and tie-downs are stabilizing components. They are different systems and may be priced as different line items.
- Notice of Installation
- The Texas installation record (Form T) associated with a reportable installation. Ask for your copy after work is done.
Where to verify a license
Check any license number yourself in the TDHCA public license-holder search, and confirm it matches the name on the written terms.
Sources and technical basis
Sources: Texas Manufactured Housing Rules (10 TAC ch. 80) for support and installation terms; the Texas Notice of Installation, Form T, for the installation record; and the HUD manufactured housing label guidance for the certification label and data plate.
Limitations
This checklist organizes a request. It is not a permit determination, a license verification, an inspection, or safety training. It does not decide scope, price, or who is qualified to do work; a licensed provider confirms all of that with you directly.
Back to Resources · See the wind zone map.